METROHUB 4

Design and build contract to construct a 2-storey Logistic Warehouse with sustainable building practices and is designed to achieve LEED Gold Certification which features a rainwater harvesting system, solar panels, and green building materials, contributing to reduced environmental footprint. Our scope is as the main contractor which encompasses the design, construction, testing, and commissioning of a proposed 2-storey warehouse (2 blocks with a mezzanine level on each floor), a single-storey amenity building which includes staff cafeteria and office space, and supporting buildings with a total build-up area of 153,120 square meters which will feature loading bays with dock levellers and roller shutters located at Kawasan Perindustrian Bandar Bukit Raja 2 in Klang.

DEVELOPER

LOCATION

COMMENCEMENT DATE

CONTRACTUAL COMPLETION DATE

SDPLOG 1 (Industrial Asset III) Sdn Bhd

Kawasan Perindustrian Bandar Bukit Raja 2, Klang

23 December 2024

22 August 2026

Dec 24' (View 1)
Dec 24' (View 1)
Dec 24' (View 2)
Dec 24' (View 2)
Dec 24' (View 1)
Dec 24' (View 1)
Dec 24' (View 2)
Dec 24' (View 2)

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.