Design and build contract to construct a high-end Logistic Hub with sustainability initiatives of LEED Certification located in Bandar Bukit Raja 2 Industrial Park, Klang. Our scope is as the main contractor which includes design and construct piling and substructure works, as well as superstructure and architectural, mechanical and electrical works for a two store ramp up warehouse with mezzanine level at each floor, a staff cafeteria facility, a show gallery, security warehouse, refuse chamber and electrical substation.

COMMENCEMENT DATE

CONTRACTUAL COMPLETION DATE

ACTUAL COMPLETION DATE

DAYS AHEAD OF SCHEDULE

29 December 2022

28 September 2024

28 August 2024

31 Days